Sustainable energy for over a hundred apartments in Kent
Sustainable Energy Services have recently been working closely with Shire Group BSC Ltd and CRS Electrical Ltd to provide a new 143-apartment building in Kent with Solar PV.
Shire Group presented us with their solar PV layout drawing, while CRS provided the wiring schematic.
From this information, we coordinated the array with the man-safe system and provided the site with our fixing requirements.
This drawing was then issued to the roofing contractor, Protan, who ensured our posts were fixed at the correct points on the roof.
We then co-ordinated the installation date with the main contractor and met with Shire Group and CRS to discuss the install for the panels.
We are due to install the panels and 3-P Inverter towards the end of July 2023.